nightoflights

The Random Lake Area Chamber of Commerce presents:

Santa Train Robbery

(Re-Enactment) December14th, 10:30 a.m. DOWNTOWN  Random Lake

 

Random Lake Area Chamber of Commerce

  
  

Search

terraserver.de/search



Match case

Main Menu

Home
Community Directory

Events
Classifieds
Photo Gallery
Random Lake Area
  Chamber of Commerce

Surrounding
  Municipalities
Using the Site/Frequently
  Asked Questions

Village of Random Lake

Department of Public
  Works Information

Meeting Minutes

Village Maps
Village Office
  Information

Village Ordinance

Winter Parking
  Information

Waste Management
  Information

Utilities
2006 Village Officials/
  Committees

Community Interest

Organizations
Parks
Recreational Activities

Weather

Random Lake Weather

 

Village of Random Lake Ordinance
CHAPTER 14 - BUILDING CODE

14.07 EROSION CONTROL.

See sec. 17.18 of this Code.

14.08 PERMIT FEES (Am. Ord. #5-95; Am. Ord. #7-00).

PERMIT REQUIRED FEES

(1)ONE- AND 2-FAMILY RESIDENTIAL:

  • (a) House $.18/sq. ft.
    • (b) Garage $.12/sq. ft.
    • $30 minimum
    • (c) Plan review (house and garage) $.03/sq. ft
    • (d) Occupancy permit (house and garage) $.02/sq. ft.
    • (e) State stamp $30
    • (f) Decks and porches $.10/sq. ft.
    • (requires zoning permit) $30 minimum
    • (g) Swimming pool (above ground) $20
    • (requires zoning and electrical permits)
    • (h) Swimming Pool (in ground) $45
    • (requires zoning and electrical permits)
    • (i) Fence (requires zoning permit) $25
    • (j) Reroof $30
    • (k) Accessory building $.10/sq. ft. $15 minimum
    • (l) Erosion control plan review $50
    • (m) Erosion control inspection $25
    • (n) Reinspection fee $25
    • (o) Additional inspection, call backs, erosion $25
    • (p) Minimum single permit $30
    • (q) Zoning permit for new construction, $25
    • additions, fences, pools, detached garages,
    • decks and porches, signs, storage sheds
    • (r) Sewer connection fee See ch. 13 of this Code
    • (s) Remodeling (includes plan review) $.11/sq. ft.
    • (t) Residential additions $.18/sq. ft. $30 minimum

(2) COMMERCIAL AND INDUSTRIAL

  • (a) Construction and HVAC fees 75% of the most recent State fee schedule contained in Wis. Adm. Code COMM 69.09
  • (b) Plumbing fees 75% of the most recent State fee schedule contained in Wis. Adm. Code COMM 69.23
  • (c) Electrical fees:
    • 1. Service and feeder panels $10
    • 2. New circuits $1.00/circuit
    • 3. Alterations to $.20/opening (outlets, existing circuits switches, lights)
    • 4. Minimum fee $30
  • (d) Building and HVAC column See fee schedule
  • combined contained in Wis. Adm. Code COMM 69.09 and 69.23
  • (e) Fence $25
  • (f) Accessory building $.10/sq. ft. $15 minimum
  • (g) Reroof $30
  • (h) Erosion control, plan review $50 (i) Erosion control inspection $25
  • (j) Additional inspection, call $25 backs, erosion
  • (k) Zoning permit for new $25 construction, additions,
  • fences, accessory buildings
  • (l) Reinspection fee $20
  • (m) Sewer connection fee See schedule in ch. 13 of this Code.

(3) ELECTRICAL PERMITS:

  • (a) Electric service $30
  • (b) Temporary electric service $30
  • (c) Electrical (house and garage) $.03/sq. ft. (d) Automatic central heating and $5 each cooling devices
  • (e) Air conditioners, 3 tons or $5 each smaller in size
  • (f) Air conditioners, over 3 tons $2/ton (g) Swimming pool wiring (above $20 ground pool)
  • (h) Swimming pool wiring $35 (in ground pool)
  • (i) Minimum charge for any one $20 permit
  • (j) Reinspection $25 each

(4) HVAC PERMITS:

  • (a) House $.02/sq. ft.
  • (b) Air conditioning (house) $.02/sq. ft.
  • (c) Natural gas service permit $25
  • (d) Minimum permit fee $30
  • (e) Incinerator unit $20 each (f) Heating, radiant heating unit $15 each

(5) PLUMBING PERMITS:

  • (a) Drain or water connections consisting of:
    • 1. Water closets $5
    • 2. Bath tubs $5
    • 3. Wash basins $5
    • 4. Kitchen sinks $5
    • 5. Laundry tubs $5
    • 6. Floor drains $5
    • 7. Urinals $5
    • 8. Shower stalls $5
    • 9. Bubblers $5
    • 10. Bar waste $5
    • 11. Hose bibbs $5
    • 12. Dishwasher $5
    • 13. Disposal $5
    • 14. Water heaters $5
    • 15. Sump pumps $5
    • 16. Water softeners $5
    • 17. Sanitary pits $5
    • 18. Water purifiers $5
  • (b) Plan review fee $15
  • (c) Inside sewer, first 100 ft. $20
  • (d) Outside sewer, first 100 ft. $40
  • (e) Water tap or sewer connection $25 in roadway
  • (f) Reinspection charge $25
  • (g) Minimum permit $30

NOTE: Upon failure to obtain a permit before work on a building has been started, except in emergency cases, the total fee shall be doubled.

bannerbottom

RLACC WOULD LIKE TO CONGRATULATE

Marilynn B. of Random Lake

Our Website Photo Contest WINNER for November!