Village of Random Lake Ordinance
CHAPTER 19 - SUBDIVISION CODE
19.06 FINAL PLAT.
(1) GENERAL REQUIREMENTS. A final
plat prepared by a registered land surveyor shall be required for all
subdivisions. It shall comply in all respects with the requirements
of §236.20, Wis. Stats.
(2) ADDITIONAL INFORMATION. The plat shall show correctly on its face,
in addition to the information required by §236.20, Wis. Stats.,
the following:
(a) Exact length and bearing of the center line and center line curves
of all streets.
(b) Exact street width along the right of way line of any obliquely
intersecting street.
(c) Railroad rights of way within and abutting the plat.
(d) Setbacks or building lines, if required by the Plan Commission,
in accordance with the guidelines set forth in sec. 19.08 of this chapter.
(e) Utility and/or drainage easements.
(f) All lands reserved for future public acquisition or reserved for
the common use of property owners within the plat.
(g) Special restrictions required by the Village Board relating to access
control along public ways, delineation of floodland limits, or to the
provision of planting strips.
(3) DEED RESTRICTIONS. The Village Board may require that deed restrictions
imposed by the subdivider be filed with the final plat.
(4) PLAT RESTRICTIONS. The Village Board may require that plat restrictions
intended to reflect Village plans and ordinances be placed on the face
of the plat.
(5) SURVEY ACCURACY. The Director of Public Works shall examine all
final plats within the Village and may make, or cause to be made by a
registered land surveyor under the supervision or direction of the Director
of Public Works, field checks for the accuracy and closure of survey,
the proper kind and location of monuments, and the legibility and completeness
of the drawing. In addition:
(a) Maximum error of closure before adjustment of the survey of the
exterior boundaries of the subdivision shall not exceed, in horizontal
distance cr position, the ratio of one part in 5,000 nor, in azimuth,
4 seconds or arc per interior angle. If field measurements exceed this
maximum, new field measurements shall be made until a satisfactory closure
is obtained. When a satisfactory closure of the field measurements has
been obtained, the survey of the exterior boundary shall be adjusted
to form a closed geometric figure.
(b) All street, block and lot dimensions shall be computed as closed
geometric figures based upon the control provided by the closed exterior
boundary survey. If field checks disclose an error for any interior line
of the plat greater than the ratio of one part in 3,000, or an error
in measured angle greater than one minute of arc for any angle where
the shorter side forming the angle is 300 feet or longer, necessary corrections
shall be made. Where the shorter side of a measured angle is less than
300 feet in length, the error shall not exceed the value of 1--1/2 minutes
multiplied-by the quotient of 300 divided by the length of the shorter
side; however, such error shall not, in any case, exceed 5 minutes of
arc.
(6) RELOCATED QUARTER CORNERS. Where the plat is located within a quarter
section, the corners of which have been relocated, monumented and
coordinated by the County, the tie required by §236.20(3)(b), Wis.
Stats., shall be expressed in terms of grid bearing and distance; and
the material and Wisconsin State plane coordinates of the monument making
the relocated section or quarter corner to which the plat is tied
shall be indicated on the plat. The grid bearing and distance of the
tie shall be determined by a closed survey meeting the error of closure
herein specified for the survey of the exterior boundaries of the subdivision.
(7) VILLAGE BOARD REVIEW. The Village Board shall receive the results
of the Director of Public Works and the State's examination prior
to approving the final plat.
(8) SURVEYING AND MONUMENTING. All final plats shall meet all the surveying
and monumenting requirements of §236.15, Wis. Stats.
(9) STATE PLANE CCORDINATE SYSTEM. All plats shall be tied directly
to a section or quarter corner monumented according to the State Plane
Coordinate System. The exact grid bearing and distance of such tie shall
be determined by field measurements, and the material and Wisconsin State
plane coordinates of the monument marking the section or quarter
corner to which the plat is tied shall be indicated on the plat. The
grid bearing and distance of the tie shall be determined by a closed
survey meeting the error of closure specified in sub. (5) above for the
survey of the exterior boundaries of the subdivision. All distances and
bearings shall be referenced to the Wisconsin Coordinate System.
(10) CERTIFICATES. All final plats shall provide all the certificates
required by §236.21, Wis. Stats., and, in addition, the surveyor
shall certify that he has fully complied with all the provisions of this
chapter. The subdivider's certificate shall be fully executed prior to
Village Board approval.
(11) RECORDATION. The final plat shall be recorded with the County Register
of Deeds only after the certificates of the Director of the Planning
Function in the Wisconsin Department of Development, of the Village
Board, of the surveyor and those certificates required by §236.21,
Wis. Stats., are placed on the face of the plat. The Clerk-Treasurer
shall record the plat within 10 days of its approval by the Village Board.
The subdivider shall, however, be responsible for payment of the recording
fee.
(12) DUPLICATE PLAT TO BE FILED. An identical reproducible copy, on
stable drafting film at least 4 mils thick, along with the recording
data, shall be placed on file with the Director of Public Works.
|