Village of Random Lake Ordinance
CHAPTER 19 - SUBDIVISION CODE
19.10 CONSTRUCTION.
(1) COMMENCEMENT. No construction
or installation of improvements shall commence in a proposed subdivision
until the preliminary plat or certified survey map has been approved
and the Director of Public Works has given written authorization.
(2) BUILDING PERMITS. No building permit shall be issued for erection
of a structure on any lot not of record until all the requirements of
this chapter have been met unless otherwise provided for in the
subdivider's agreement. In exceptional circumstances, the Village
Board may authorize the issuance of a building permit prior to the
completion of all improvements; however, no occupancy permit shall be
issued prior to the completion of all improvements.
(3) PLANS. The following plans and accompanying construction specifications
may be required by the Director of Public Works before authorization
of construction or installation of improvements:
(a) Street plans and profiles showing existing and proposed grades,
elevations and cross-sections of required improvements.
(b) Sanitary sewer plans and profiles showing the locations, grades,
sizes, elevations and materials of required facilities.
(c) Water plans and profiles showing the locations, grades, sizes, elevations
and materials of required facilities.
(d) Storm water drainage facility plans and profiles showing the locations,
grades, sizes, cross-sections, elevations and materials of required facilities.
(e) Planting plans showing the locations, age and species of any
required trees.
(f) Additional special plans or information as required; where required
by State agencies, such plans shall be approved by such agencies prior
to the commencement of construction.
(4) INSPECTION. The subdivider, prior to commencing any work within
the subdivision, shall make arrangements with the Director of Public
Works to provide for adequate inspection. The Director shall inspect
and approve all completed work prior to approval of the final plat or
release of the sureties.
(5) LAPSE OF SITE PLAN APPROVAL (Cr. Ord. #5-00). In the event the project
for which the site plan approval was granted is not completed within
3 years of the date of approval, such approval shall lapse and there
shall be no further development or construction. Upon application, the
Plan Commission may renew the site plan as originally granted or require
changes as deemed appropriate before renewing approval.
|