Village of Random Lake Ordinance
CHAPTER 19 - SUBDIVISION CODE
19.11 FEES.
(1) GENERAL. The subdivider shall pay to
the village all fees as hereinafter required at the time specified.
(2) PRELIMINARY PLAT REVIEW FEE. (a) The subdivider shall pay a fee
of $100 plus $1.00 for each lot or parcel over 30 in number within the
preliminary plat to the Clerk-Treasurer at the time of first application
for approval of any preliminary plat to assist in defraying the cost
of review.
(b) A $10 reapplication fee shall be paid to the Clerk-Treasurer at
the time of reapplication for approval of any preliminary plat that has
been previously reviewed.
(3) FINAL PLAT REVIEW FEE. (a) The subdivider shall pay a fee of $50
plus $1.00 for each lot or parcel over 30 to the Clerk-Treasurer at the
time of first application for approval of the final plat to assist in
defraying the cost of review.
(b) A $10 reapplication fee shall be paid to the Clerk-Treasurer at
the time of reapplication for approval of any final plat that has been
previously reviewed.
(4) CERTIFIED SURVEY MAP REVIEW FEE. The subdivider shall pay a fee
of $25 plus the recording fee to the Clerk-Treasurer at the time of application
for approval of such subdivision to assist in defraying the cost of review.
(5) PARK FEES. (a) Determination of Fees.All persons subdividing land,
including minor subdivisions, within the Village for residential purposes,
or converting existing residential buildings to create additional residential
units, shall pay a park fee of $250 for each anticipated residential
unit.
(b) Payment of Fees.1. Final Plats and Certified Survey Maps. The subdivider
shall pay the park fees to the Clerk-Treasurer as required by this subsection
before the Village Board approves the final plat or certified survey
map.
2. Converting Existing Residential Units. The park fees provided in
par. (a) above shall be paid prior to the issuance of a building permit.
(6) INSPECTION FEE (Cr. Ord. #1-96). The
subdivider shall pay a fee equal to the actual cost to the Village for
such inspection as the Director of Public Works deems necessary
to assure that the construction of the required improvements is in compliance
with the plans, specifications and ordinances of the Village or any other
governmental authority.
(7) ENGINEERING FEE (Cr. Ord. #1-96). The subdivider or developer shall
pay a fee equal to the actual cost to the Village for all engineering
work incurred by the Village in connection with the land division or
minor land division. In addition:
(a) Engineering work shall include the review and approval of construction
plans. The Village Engineer or Director of Public Works may permit the
subdivider to furnish all, some or part of the required construction
plans. The fee for engineering work shall be billed periodically and
shall be payable within 10 days.
(b) Inspection fees provided for in sec. 19.10(4) of this chapter.
(8) LEGAL FEES (Cr. Ord. #1-96). The subdivider or developer shall
pay a fee equal to the cost of any legal work which may be undertaken
by the Village in connection with the land division, minor land division
or planned development. Legal work shall include all conferences regarding
the subdivision or development and the drafting of contracts and agreements
between the Village and the subdivider. Legal fees shall be billed periodically
and shall be payable within 20 days.
(9) EROSION CONTROL FEE (Cr. Ord. #1-96). See sec. 17.18 of this Code.
|